Scheduling
Steel on site the day you pour, not the day after.
Concrete doesn’t wait for anyone. Pours get booked around pumps, trucks, inspections and the weather, and if the reinforcement isn’t on site and fixed by then, everything behind it slips. A missed pour costs far more than the steel ever did.
At Optimum Reo, our schedulers sit between your program and our production floor. They work back from your pour dates so the right bar and mesh is made, loaded and delivered in the order your crew will actually use it.
What scheduling with us looks like
- Planned back from your pour date: Give us the program and we work out when each piece has to be made, loaded and on the road to land when you need it.
- Staged to your sequence: Footings, then columns, then slab. A big order can be split into drops, so each stage arrives when your crew is ready for it and your site isn’t buried in steel you can’t use yet.
- Production and delivery on the same page: Our schedulers work directly with the people making your steel and the people delivering it, so nothing gets lost between the factory floor and the truck.
- Room for change: Programs move. Tell us early when a pour shifts and we’ll rework the schedule with you, instead of leaving a truck waiting at your gate.
- Straight answers: We tell you what’s booked, what’s in production and what’s on its way. If a date can’t be met, you hear it from us first.
Good scheduling comes down to talking early. The sooner we have your drawings, bar schedules and target pour dates, the more options we have and the fewer rushed orders anyone has to deal with.
Whether you’ve got a single slab or several sites running at once, tell us through the quote form and we’ll talk through your timeline. Already got a pour date locked in? Tell us, and we’ll say straight away whether we can make it work.